Geelong West Structural Renovation – Base Stage

Geelong West Structural Renovation – Base Stage

The base stage being installed at our client’s structural renovation project in Geelong West.

The floor structure is being constructed using conventional timber joists and bearers on timber stumps set in concrete. As with most structural renovations; the soil was classified “P” (problem site), which meant that the stumps had to be bored to a depth of 1 metre.

Read More